Based on the analysis of the quality management of the assembled building project, this paper introduces the design concept, geographical location, geological landform, and climate conditions of a certain assembled building and analyzes the control points and general requirements of the quality management of this project. On this basis, the project management system is established, and the management network system is compiled from three aspects: personnel management, system management and technical process management. According to this system, the content of quality management in each stage is determined.
References
[1] Zhou, M., colleagues. (2024) A quality management method for prefabricated building design based on BIM and VR-integrated technology. Applied Sciences, 14(4), 1635.
[2] Winter, M., Smith, C., Morris, P., Camil, S. (2006) Directions for future research in project management: The main findings of a UK government-funded research network. International journal of project management, 24(8), 638-649.
[3] Akinola, M., Haupt, T. C., Edwards, D. J., Simper, F. (2022) A bibliometric review of the status and emerging research trends in construction safety management technologies. International Journal of Construction. Management, 22(14), 2699-2711.
[4] Aiyetan, A. O., Das, D. K. (2022) Factors and strategies for improving construction management on sites in mega-projects in South Africa: An explorative survey. Infrastructures, 7(2), 19.
[5] Chai, Y., et al. (2023) Construction quality of prefabricated buildings: a structural equation modeling approach. Applied Sciences, 13(17), 9629.
[6] Wini, I. Y., Shen, G. Q. (2020) Critical success factors for management of the initial stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(9), 2315-2333.
[7] Alzoubi, H. M., Invariant, M., Ahmed, G. (2022) Investigating the impact of total quality management practices and Six Sigma processes to enhance the quality and reduce the cost of quality: the case of Dubai. International journal of business excellence, 27(1), 94-109.
[8] Gunawardena, T., Mendis, P. (2022) Prefabricated building systems-design and construction. Encyclopedia, 2(1), 70-95.
[9] Fang, Y., Gao, S., Jiang, Y., Li, S. (2023) BIM and lean construction in prefabricated housing construction in China. International Journal of Lean Six Sigma, 14(7), 1329-1353.
[10] Gao, S., Low, S. P., Nair, K. (2018) Design for manufacturing and assembly (DfMA): A preliminary study of factors influencing its adoption in Singapore. Architectural engineering and design management, 14(6), 440-456.
Share and Cite
Wang, Z. (2024) Study on Construction Management Quality of Assembled Building Project. Scientific Research Bulletin, 1(2), 16-21. https://doi.org/10.71052/srb2024/BUFF9779