Application of Earned Value Method in Project Cost Management and Schedule Management

Wenjing Xu*
Xi’an Shiyou University, Xi’an 710065, China
*Corresponding email: xuwenjing@sina.com
https://doi.org/10.71052/srb2024/RCBV7940

At present, with the rapid development of China’s economy, the development of the construction industry has made a new breakthrough. Project management requires the construction industry to continuously play its role and value and improve the ability of project management. Earned value method, as an important way in the field of project management, can make the whole project management rise to a new height. I will elaborate on the specific principle of earned value method, by fully introducing the specific role of earned value method in engineering projects, to provide reference and basis for practitioners to improve their management ability.

References
[1] Aramali, V. (2024) An effective Earned Value Management System (EVMS) is based on 27 environmental factors. International Journal of Project Management, 42(5), 109-122.
[2] Reda, S. G., Belachew, K. T., Demiss, B. A., Ali, S. K. (2025) Performance evaluation of construction project by earned value management system in Amhara waterworks construction enterprise. Discover Civil Engineering, 2(1), 1-25.
[3] de Rezende, L. B., Denicol, J., Blackwell, P., Kimura, H. (2022) The main project complexity factors and their interdependencies in defence projects. Project Leadership and Society, 3, 100050.
[4] Gunduz, M., Aly, A. A., El Mekkawy, T. (2022) Value engineering factors with an impact on design management performance of construction projects. Journal of Management in Engineering, 38(3), 04022012.
[5] Rounaghi, M. M., Jarrar, H., Dana, L. P. (2021) Implementation of strategic cost management in manufacturing companies: overcoming costs stickiness and increasing corporate sustainability. Future Business Journal, 7(1), 31.
[6] Ren, S. (2022) Optimization of enterprise financial management and decision‐making systems based on big data. Journal of Mathematics, 2022(1), 1708506.
[7] Elsaid, M. (2025) Comparative analysis of Earned Value Management techniques: Earned Duration, Earned Schedule, and Planned Value. Scientific Reports, 15(1), 1-12.
[8] Silva, C. S., Pereira, C., Magano, J. (2023) The value of project management to competitiveness: Key factors from a holistic and practical perspective. International Journal of Managing Projects in Business, 16(1), 67-91.
[9] Guo, K., Zhang, L. (2022) Multi-objective optimization for improved project management: Status and future directions. Automation in Construction, 139, 104256.
[10] Moradi, S., Ansari, R., Taherkhani, R. (2022) A systematic analysis of construction performance management: Key performance indicators from 2000 to 2020. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 1-17.

Share and Cite
Xu, W. (2024) Application of Earned Value Method in Project Cost Management and Schedule Management. Scientific Research Bulletin, 1(2), 18-23. https://doi.org/10.71052/srb2024/RCBV7940

Published

18/10/2024